A water bill typically comprises 6 key elements.
- Water Charges – fees for water supplied to your premises
- Fixed water charge – a fee for connection to the supply network based on the size of your meter
- Volumetric charge – a fee for the volume of water supplied to our premises per m3 (1,000 litres)
- Waste Charges – fees for removal of waste from your premises
- Fixed waste charge – a fee for connection to the sewage network based on the size of your meter
- Volumetric charge – a fee for the volume of waste water you consume per m3 (1,000 litres)
- Drainage Charges – a contribution towards the rain water sewage system
- Property drainage – a fee for the removal of rainwater that lands on your property
- Roads drainage – a fee for removal of surface water on the roads that connect to your property